The values of K30 ranged from 183.3 to 478.5MN/㎥ and average value was 249.0MN/㎥. The all test result satisfied the minimum requirement value, 110MN/㎥, of the specification to control the compaction quality.

How do you find subgrade modulus?

What is modulus of subgrade reaction? Modulus of subgrade reaction is defined as the pressure per unit deformation of the subgrade at specific pressure or deformation. It is expressed as k=p/s. Here, k = modulus or coefficient of subgrade reaction; p = applied pressure and s = deformation of soil settlement.

What is modulus of subgrade reaction of soil?

Definition. • Modulus of subgrade reaction is the reaction pressure sustained by the soil sample under a rigid plate of standard diameter per unit settlement measured at a specified pressure or settlement.

How do you calculate subgrade modulus from soil bearing capacity?

k = 40 x SF x qa, where SF is factor of safety considered in bearing pressure calculation and qa is allowable soil bearing capacity. So, you could employ the above equation in determining the Soil Subgrade Modulus.

What is CBR value?

The California Bearing Ratio (CBR) is a measure of the strength of the subgrade of a road or other paved area, and of the materials used in its construction. The ratio is measured using a standardized penetration test first developed by the California Division of Highways for highway engineering.

What is modulus of subgrade reaction k?

The modulus of subgrade reaction (k) is used as a primary input for rigid pavement design. It estimates the support of the layers below a rigid pavement surface course (the PCC slab). The k-value can be determined by field tests or by correlation with other tests.

What is subgrade modulus?

The Subgrade Modulus, also known as the Modulus of Subgrade Reaction, is a stiffness parameter typically used in defining the support conditions of footings and mat foundations, such as that shown on Figure 1. The parameter is expressed in units of [Force]/[Length]3. Mat foundation for a building under construction.

How do I calculate soil spring?

The final spring stiffness is determined by multiplying the stiffness per unit area calculated above by the area. The direction of the linear elastic vertical springs for the soils adjacent to piles should be perpendicular to the ground (GCS ‘-‘Z direction).

What is the K value of soil?

What is the K Factor? The K Factor is an index which quantifies the relative susceptibility of the soil to sheet and rill erosion. K Factor is used in the RUSLE2 soil loss prediction equation. Values range from 0.02 for the least erodible soils to 0.64 for the most erodible.

How do you measure soil modulus?

Soil elastic modulus can be estimated from laboratory or in-situ tests or based on correlation with other soil properties. In laboratory, it can be determined from triaxial test or indirectly from oedometer test.

What is the CBR value for subgrade?

CBR value for subgrade in road construction in India : CBR value is taken at 2.5mm & 5 mm penitration. in subgrade material CBR value should be nearly 15-19% .

What is soaked and Unsoaked CBR?

A soaked sample is created by soaking the sample for 4 days. Both soaked and unsoaked CBR tests are used in the assessment of granular materials used in bases, subbases, and subgrades. The evaluation of strength behavior is considered to be most criti- cal on the wet side of the optimum moisture content (OMC).